THE ALGORITHM OF OPERATIVE RECOGNITION OF ANOMALOUSLY HIGH PRESSURE OF A LAYER IMMEDIATELY DURING SLOTTING

Anomalous high pressure of a layer (AHPL), met during drilling, represent serious danger to chisel team, for the process equipment and environment, since the opening of a layer with AHPL, considerably exceeding pressure of a pole of a washing liquid results as a rule in catastrophic wastes, the danger of which is aggravated by suddenness of its development. In this connection forecasting of possible zones of AHPL is one of the urgent problems in drilling of petroleum and gas chinks. Know-how on algorithm is not patented. The joint registration of the international patent is necessary.

The algorithm of operative recognition of AHPL directly in process of slotting has such important significance at the realization of chisel activities, that unwillingness use it can be followed by tragedy for people, environment and heavy damage to the business. The conventional method of operative forecasting of AHPL zones in process of slotting is the method of forecasting till a curve of change of generalized parameter of drillability d with depth L (d-exhibitor). The average generalized parameter dav is determined for each 25 m of footage. The schedule of change in logarithmic scale d (L) is under construction. The line passing through points, describing dav, is a line of normal condensation of clay. Entering the zone of AHPL parameters are sharply changed having of insignificant influence to average significances (~1/N, where N - quantity of points d-exhibitor through each 25 meters). Deviation of parameters of a plot of reference direct from average points determines a moment of opening of a zone of AHPL. The actions of team in these cases are determined by the specifications of drilling.

However, the standard method has essential defect expressed in its proximity (inaccuracy), caused by strong dependence of mechanical speed of drilling on many factors, by virtue of what the definition of the above named generalized parameter is an incorrect problem, what reduces accuracy and probability of duly definition of a AHPL zone.

We have developed a method deprived of defects, inherent to the standard method, that allows to increase accuracy and timeliness of definition of AHPL.

With help of a number of indirect parameters accompanying process of introduction of chisel in a rock the algorithm allows to determine a moment of approach of chisel to a AHPL zone, i.e. before opening a layer, that allows to take necessary measures in time and to prevent catastrophic waste of petroleum (gas) and to avoid ecological accident, which can endanger live of people. The solution of a problem is especially important for drilling by the sea, when the area of a marine platform is limited and there is a congestion of large number of the attendants, and liquidation of failure and complications stipulated with AHPL by the sea is extremely expensive and technically difficult problem.

The economic benefit is connected to safety of the people, with the costs for recovery of the environment after emergency waste of petroleum (gas).

The know-how value makes US $700 thousand.